Rongai Route

Kilimanjaro Trekking Routes

Group Departure / Private Departures Are Available

safari Duration

Tour Type

Price per Person - Based on 2 Pax

Trip Overview

A 7 day ascent of Kilimanjaro starting on the Eastern side of Kilimanjaro. This side of the mountain is relatively dry and has a relatively short forest zone. It skirts the base of Mwenzi and then ascends via Gilman’s point to Uhuru Peak. There is an acclimatisation day at Mawenzi Tarn. The descent is via the Marangu route trail.

Why this itinerary?

A 7 day ascent that is relatively gradual. The numbers of hikers on this route tends to be less than Machame or Marangu routes and the chance of seeing wildlife higher. Comes highly recommended but note that the drive to the starting point takes a long time and the descent is via the Marangu route (i.e. busy).

Highlights

Kilimanjaro: views over the Mawenzi and Kibo saddle, close views of Mawenzi, the Kibo crater and ash pit and glaciers on the roof of Africa.

Full Itinerary

Day 1: KILIMANJARO – RONGAI

In the morning you drive around Kilimanjaro to the Eastern side to NaleMoru to register at the gate. Hiking is through farm and pine plantations and then through afromontane forest. Overnight Simba Camp (full board).

DAY 2: KILIMANJARO – CAVES

Ascent to Second Cave (3450) with views of the Eastern icefields. After lunch leave main trail and head towards Mawenzi. Kikelewa caves campsite is in sheltered valley. Overnight Kikelewa Caves Camp (full board).

Day 3: KILIMANJARO – MAWENZI

Hike up close to Mawenzi tarn (4330) located in a cirque beneath Mawenzi. In the afternoon you head out for an acclimatisation walk with your guide. Overnight Mawenzi Tarn Camp (full board).

Day 4: KILIMANJARO – MAWENZI

Today is an acclimatisation and rest day. Your guide takes you on a hike which normally lasts for around 4 hours. Overnight Mawenzi Tarn Hut (full board).

Day 5: KILIMANJARO – KIBO

Today you cross the saddle between Mawenzi and Kibo in the alpine desert zone. The camp is situated at 4700 meters. In the afternoon it is time to prepare for the night ascent and then an early dinner and to bed for a few hours. Overnight Kibo Camp (full board).

Day 6: KILIMANJARO – HOROMBO

An early start is required to arrive in time for a dawn on the roof of Africa! You ascend Kibo volcano via Gilman’s point (5685m) which takes around 6 to 7 hours. It is then a further 11/2 to 2 hours to the summit and then descent to Kibo for refreshment and refuel and then continue down to Horomob camp. Overnight Horombo Camp (full board).

Day 7: KILIMANJARO – END

The final descent takes you back through the heath zone and forest to the Marangu gate.So here at Gate your team will have prepared another scrumptious and fresh lunch and your transfer vehicles will be waiting to collect you. Here you will say goodbye to our mountain staff before heading to the hotel near Arusha for a farewell dinner and either overnight or a day room and departure. Extend your Tanzanian vacation with Kili Climb Africa Safaris on safari, walking safari or other adventures.

Book This Trip

1 Step 1
keyboard_arrow_leftPrevious
Nextkeyboard_arrow_right
FormCraft - WordPress form builder

Tailor make your Trip

customize every detail of your lifetime

RELATED Kilimanjaro trekking packages

Lemosho Route Via Kibo Crater

A 9 day ascent to the roof of Africa. Starting at Lemosho on the Western side and traversing across the most spectacular parts of the mountain,

Kilimanjaro Climb Via Shira
Route, Day Summit

The shira route is a little used trail that begins near shira ridge. It is nearly identical to the lemosho.

Lemosho Route Via Stella
Point

An 8 day ascent to the roof of Africa. Starting at Lemosho on the Western side and traversing across …